ACE Master Costing Module

Cloud costing & quotation tool — sign in to access your team's shared data.

ACE Master Costing Module

Stainless Steel Work Table — cloud costing & quotation tool, synced live via Supabase.

● Live

Cost Breakdown by Item (Material / Labour / Bought-Out)

Material Cost by Grade

Selling Price Composition (Direct Cost → Overheads → Margin)

Aggregated across every registered item.

Equipment Register

One row per equipment item. Add a row, choose modules/material/accessories from the dropdowns (sourced live from Master Rates), and every downstream sheet recalculates automatically. Item Code is assigned by the database when a row is created. Changes here save immediately and sync to your whole team.

0 items
CodeDescription Length (mm)Width (mm)Height (mm) ShelvesSinks Module 1Module 2Module 3 Bending DetailMaterialThk (mm) Accessory 1Accessory 2QtyRemarks

Quotation

Rolls up Material + Labour + Bought-Out into Direct Cost, applies Factory Overhead / Packing & Forwarding / Freight / Contingency / Margin from Master Rates, and produces the Unit and Total Selling Price. Click any row for the full cost breakdown.

CodeDescription Material ₹Labour ₹Bought-Out ₹Direct Cost ₹ Factory OH ₹P&F ₹Freight ₹Contingency ₹ Cost of Prod. ₹Margin ₹Qty Unit Price ₹Total Price ₹

Master Rates

The single rate card and the single source for every dropdown in this tool. Add or remove a row in any block and it flows everywhere immediately — no other tab needs to change. Every edit here saves straight to the shared database.

1. Raw Material — Stainless Steel Sheet

Material GradeDensity (kg/m³)Rate (₹/kg)

2. Sheet Thickness Reference

Reference only — thickness is typed directly on Equipment Register.

Thickness (mm)Typical Use

3. Process Labour Rates (₹/hour)

These six fixed processes drive Process Labour costing.

ProcessRate (₹/hr)

4. Bought-Out Accessory Rates

AccessoryUnitRate (₹/unit)

5. Overheads, Freight & Margin (% of Direct Cost)

6. Labour-Hour Drivers by Module (hrs, per equipment item)

ModuleCutting hrsBending hrsWelding hrsPolish hrsAssembly hrs

7. Bending Area Allowance Factor

Bending Detail ParameterArea Factor

8. Accessory Dropdown Options

Must spell-match a Section 4 item name exactly (or "(none)").

Accessory Option

Weight Assumptions (Bought-Outs)

Legacy Benchmark

Enter your old / manual quotation price per item to see variance ₹ and % against this tool's computed price. Flagged "HIGHER"/"LOWER" beyond ±5%.

CodeDescriptionNew System Unit Price ₹Legacy / Old Price ₹Variance ₹Variance %Flag

How this tool works

This is a cloud-connected conversion of the ACE Master Costing Module spreadsheet. It reads and writes a shared Supabase database in real time, so everyone on your team who signs in sees the same equipment register, rates and quotations — changes appear for other users within a second or two, no refresh needed.

Workflow

  • Master Rates — set your material ₹/kg, labour ₹/hr, bought-out rates, overhead/margin %, module labour-hour drivers, bending area factors and accessory dropdown options. Everything else reads from here.
  • Equipment Register — add one row per item: dimensions, module selections, material, thickness, accessories and quantity.
  • Quotation — see the full cost roll-up for every item. Click a row for the detailed breakdown.
  • Dashboard — live KPI cards and charts summarizing everything above.
  • Legacy Benchmark — compare against an old/manual price.

Key calculation logic (matches the original workbook)

  • Component Costing: Top Area = Length(m) × Width(m). Shelf Area = Top Area × No. of Shelves. Total Developed Area = (Top Area + Shelf Area) × Bending Area Factor. Weight (kg) = Total Developed Area × Thickness(mm) × Density(kg/m³) / 1000. Material Cost = Weight × Rate(₹/kg).
  • Process Labour: Cutting/Bending/Welding/Polish/Assembly hours = sum of the driver hours for whichever of Module 1/2/3 are selected. QC hours is a fixed 0.15 hr per item, costed at Master Rates ₹/hr, and summed to Total Labour Cost.
  • Bought Outs: Accessory 1 & 2 cost from their Master Rates unit rate (feet/wheel accessories multiply by the "Accessory qty" assumption). "WITH LEGS" adds a leg-set cost, "WITH ANGLES" adds an angle-frame cost, "WITH WHEELS" adds heavy-duty wheels unless a wheel accessory is already selected. Sink cost = No. of Sinks × Sink Bowl Fabrication Allowance.
  • Quotation: Direct Cost = Material + Labour + Bought-Out. Factory OH / Packing & Forwarding / Freight / Contingency are each a % of Direct Cost. Cost of Production = Direct Cost + those four. Margin = Cost of Production × Margin %. Unit Selling Price = Cost of Production + Margin. Total Selling Price = Unit Price × Qty.

Accounts & access